Building in Bicton: Knockdown Rebuild, Granny Flat & Duplex Guide

City of Melville (WA) · Indicative rules and costs for homeowners · 中文报告同样支持

Min lot (KDR)

350㎡

Max height

9m

Setbacks (front/side)

4m / 1m

DA timeline

12–22 wks

Fast-track CDC

Usually DA only

Build cost

$2100–$3200/㎡

📊 Indicative ranges from council planning controls and recent market data — not quotes, and individual blocks vary.

Heritage: LowFlood: LowBushfire: Low

Applecross/Mt Pleasant. Popular KDR area. Swan River lots attract premium pricing.

What can YOUR block in Bicton fit?

Enter your street address and our AI checks the official cadastre (your measured lot size), zoning, heritage and flood overlays — then gives you costs, approval pathway and next steps. Free, 2 minutes, no signup. 支持中文。

Get my free feasibility report →

Frequently asked questions — Bicton

Can I knock down and rebuild in Bicton?

Generally yes — City of Melville requires a minimum lot of around 350㎡ for a standard knockdown rebuild, with a maximum building height of 9m. Most projects need a full DA (development application).

How long does council approval take in Bicton?

A DA through City of Melville typically takes 12–22 weeks in practice.

How much does it cost to build in Bicton?

Typical build costs around Bicton run $2,100–$3,200 per square metre of floor area, plus demolition of roughly $13,000–$22,000. These are indicative ranges, not quotes.

Can I build a granny flat in Bicton?

Most WA councils allow secondary dwellings subject to lot size and overlay rules — check City of Melville's planning scheme or run a free feasibility report.

What are the main risks for building projects in Bicton?

For the City of Melville area: heritage risk is low, flood risk is low, bushfire risk is low. Applecross/Mt Pleasant. Popular KDR area. Swan River lots attract premium pricing.

Nearby areas under City of Melville

This page provides general guidance for the City of Melville area and is not advice about any specific property. Planning controls change — always confirm with council or run a block-specific feasibility report. © 2026 AusBuildCircle 澳洲建房圈.